1. To dismantle, first of all, the old artificial turf must be demolished, during the whole process of demolition, care should be taken not to destroy the original foundation, which is usually a foundation cushion with concrete, asphalt, or a proportional mixture of lime and clay.During the whole installation process, the lawn is glued to the pavement or seams and non-woven fabrics with adhesives. During the whole process of demolition, use special tools to remove the lawn and the joint layer, and there is no need to destroy the unevenness of the foundation.
2. Remove old lawns, quartz sand, particles. Old materials cannot be used, and after many years of use, old materials have lost their original properties, and they are mixed with a lot of unclean things such as dust and waste.
3. The dismantled waste raw materials are all measured in tons as enterprises, so it is necessary to fully consider the price budget. When many beginners go to see the place, they see that the lawn of the place is already close to the baldness, and they think that there will be less waste that must be transported and removed. That’s not the case. Since the particulate matter and quartz sand added in the case of building a new site will basically not change. Taking a football field as an example, it is filled with about 200 tons of quartz sand, which is a huge garbage removal work, so it should be fully considered in the case of cost budgeting.
4. Before laying a new artificial turf, you must do a good job of cleaning the place, it is best to clean it with tap water, remove the floating dust and soil on the top of the tidy place, and then gradually lay it.
This is the problem to be fully considered in the case of artificial turf renovation, if what work is not done, it is likely to cause certain obstacles and troubles to the renovation work behind.